Sunday, September 6, 2009





I couldn't wait for the frame check so Bryce and I went by the house today to snap some pictures. Looks the wiring is all done, at least for now unless there are any errors or changes that need to be made. The Concept Design guys haven't started their work so there is nothing for the audio setup yet, but I'm sure that will happen as soon as we sign off.

The bathtubs are all in the house so looks like it won't be long until they are all setup and installed. The master suite soak-er tub is roughly in place and I was tempted to sit in it just for the photo op, but resisted. The floors have been cleaned up of all the water and looks like they pressure washed the sames to the underlaying floor sheathing.

The fireplace is also in place. We stuck with the standard because it's going to most like be used for looks than function but based on pricing, changing it later won't be any more expensive than getting the upgrade.

One thing I have learned is that builders sure write some interesting stuff on the walls to give directions. "Fix Corner! WTF?" Nice things to know are written in the wall.

No comments:

Post a Comment